Phase 1 complete — Pinterest dispatcher built and operational. Project closed.
Project Detail
Attain Supplements Content Engine
P1DoneOperate and migrate the Attain Supplements content engine from unreliable Make.com posting to OpenClaw plus Blotato, starting with Pinterest product posts.
Stabilize Attain Supplements social publishing by replacing the final posting stage with OpenClaw supervised Blotato dispatch.
Project Discipline
Daily operating signals
Bias the project surface toward what matters for execution today.
Project Pulse
Execution State
A compact operational readout for the current health of this project.
Project Accountability
Ownership Surface
Quick read on ownerless work, blocked accountability, and reassignment cues inside this project.
Open work without a direct owner.
Active projects missing top-line accountability.
Constraints that can stall with nobody explicitly on point.
Open handoffs or waiting items that still need accountable routing.
| Owner | Active Tasks | Waiting | Blockers | Incoming Handoffs | Outgoing Handoffs | Needs Attention |
|---|---|---|---|---|---|---|
| Jack | 0 | 0 | 0 | 0 | 0 | 0 |
Reassignment Queue
Unassigned Work (0)
No open tasks are currently unassigned.
Waiting-On Enforcement
Needs Ownership Cleanup (0)
Waiting-on-owner tasks are routed cleanly right now.
Supporting Coverage
Optional Table Degradation
These supporting surfaces are currently unavailable in Airtable, but core project execution remains usable.
- requirements
Read coverage is degraded and writes are disabled until the supporting table is restored.
- incidents
Read coverage is degraded and writes are disabled until the supporting table is restored.
Task Ledger
Execution Tasks
| Task | Status | Assigned | Priority | Waiting On | Next Step |
|---|---|---|---|---|---|
| Build OpenClaw Pinterest Dispatcher for Attain Supplements | Done | Forge | P1 | — | Inspect repo/workspace, confirm best implementation location, then add Airtable field/view spec and dispatcher foundation. |
Recent Activity
Latest Signals
- Project updated: Attain Supplements Content EngineDecision
Mission Control API · Apr 13, 1:12 PM
Project fields updated.
Scope Control
Requirements
Define what must be true, who owns it, and how the team knows it is done.No requirements found for this project yet. This stays usable even if the Airtable Requirements table is missing.
Requirements is currently unavailable in Airtable. Existing project detail remains visible, but requirement writes are temporarily disabled until the supporting table is restored.
Create requirement
Use this form to keep scope precise, testable, and traceable to execution.
Quality Workflow
Retrospectives, Closure, and Lessons
First-pass MVP: close with evidence, capture lessons near the event, and surface repeat patterns instead of burying them in notes.